Wednesday, 6 May 2009
NB
Unfortunately our sound logs have been irreversibly ruined by water, and therefore we will be unable to hand these in. We could attempt to fabricate some, but I think it is better to be honest in situations like this.
The End Is Near
Well everything is pretty much finished now, so a big thank you to all of Hot Thrust Productions for a job well done.
The film is looking good, unfortunately we have had to edit out some of the jokes to get it closer to five minutes, but we still have a film to be proud of.
I was planning to put the evolution of our script on the blog, but formatting issues won't allow me to do this properly.
Also, at the bottom of every post it states that it was me (Scott) who posted them, but this isn't true, as everyone accessed the blog through my user details. You can probably tell who wrote what due to the nature of the research, and subsequently who didn't write at all. I did ask everyone multiple times to put their research up on the blog, so no-one has any excuse for not doing so.
Anyway, it is almost over, and I think that this has been a valuable exercise in the film making process, and we have truly made a film to be proud of.
Roll on the post screening party!
The film is looking good, unfortunately we have had to edit out some of the jokes to get it closer to five minutes, but we still have a film to be proud of.
I was planning to put the evolution of our script on the blog, but formatting issues won't allow me to do this properly.
Also, at the bottom of every post it states that it was me (Scott) who posted them, but this isn't true, as everyone accessed the blog through my user details. You can probably tell who wrote what due to the nature of the research, and subsequently who didn't write at all. I did ask everyone multiple times to put their research up on the blog, so no-one has any excuse for not doing so.
Anyway, it is almost over, and I think that this has been a valuable exercise in the film making process, and we have truly made a film to be proud of.
Roll on the post screening party!
Shooting Schedule
Friday 24th April
12.30pm
Meet at The Pinnacles, equipment check
1pm
Football Pitch – Football flashback
2pm
Hallam Booze – Shop scene
2.30pm
Postbox – Posting letter
3pm
Sheffield station tram stop – entire wallet sequence
5pm
Break for dinner
6pm
Interior scenes – Letter writing, Letter opening, Party scenes – birthday, drunk scenes
7.30pm
Collect Props for next day
Saturday 25th April
3pm
Meet at station, equipment check.
Take tram to Arberthourne
3.30pm
Interior scenes in Arberthourne – Entire working from home sequence
(3.30 – 5pm = line readings and set construction)
7.30pm
Break for dinner
8.30pm
The Pinnacles – Night time drunk scenes
Sunday 26th April
12pm
Meet at Liberty Works, equipment check
12.30pm
Reception and hallway scenes
2.30pm
Break for lunch
3pm
Kathryn’s house – Insult sequence, actors get into costume
4pm
Kathryn’s house – Entire interview scene
(4-5pm = line readings and set construction)
8pm – Shooting finished
Editing schedule
Images and sounds logged by end of Monday 27th April
First cut by end of Tuesday 28th April
Finalised rough cut ready for morning of Thursday 30th April
Finished Film ready for morning of Thursday 1st May
12.30pm
Meet at The Pinnacles, equipment check
1pm
Football Pitch – Football flashback
2pm
Hallam Booze – Shop scene
2.30pm
Postbox – Posting letter
3pm
Sheffield station tram stop – entire wallet sequence
5pm
Break for dinner
6pm
Interior scenes – Letter writing, Letter opening, Party scenes – birthday, drunk scenes
7.30pm
Collect Props for next day
Saturday 25th April
3pm
Meet at station, equipment check.
Take tram to Arberthourne
3.30pm
Interior scenes in Arberthourne – Entire working from home sequence
(3.30 – 5pm = line readings and set construction)
7.30pm
Break for dinner
8.30pm
The Pinnacles – Night time drunk scenes
Sunday 26th April
12pm
Meet at Liberty Works, equipment check
12.30pm
Reception and hallway scenes
2.30pm
Break for lunch
3pm
Kathryn’s house – Insult sequence, actors get into costume
4pm
Kathryn’s house – Entire interview scene
(4-5pm = line readings and set construction)
8pm – Shooting finished
Editing schedule
Images and sounds logged by end of Monday 27th April
First cut by end of Tuesday 28th April
Finalised rough cut ready for morning of Thursday 30th April
Finished Film ready for morning of Thursday 1st May
Subscribe to:
Comments (Atom)